NEW QUESTION # 36
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.

  • A. You post the entire manufactured quantity to one batch if the product quality changes during production.
  • B. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
  • C. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
  • D. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.

Answer: B,C


NEW QUESTION # 37
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.

  • A. Queue time
  • B. Float before production
  • C. Load time
  • D. Transit time
  • E. Setup time

Answer: A,B,E


NEW QUESTION # 38
What are some options for creating a production order?
Note: There are 2 correct answers to this question.

  • A. By partially converting a planned order
  • B. By converting a purchase requisition
  • C. By setting a Kanban container to full
  • D. By setting a Kanban container to empty

Answer: A,D


NEW QUESTION # 39
How do you assign resources in a master recipe with operations and phases?

  • A. You assign resources to the sub-operations.
  • B. You assign resources to the phases.
  • C. You assign resources to the header of the master recipe.
  • D. You assign resources to the operations.

Answer: D


NEW QUESTION # 40
Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.

  • A. Replenishment using reservations
  • B. Replenishment using process orders
  • C. Replenishment using planned independent requirements
  • D. Replenishment using direct transfer posting

Answer: A,D


NEW QUESTION # 41
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program.
Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Assembly processing with production orders (82)
  • C. Planning without final assembly (50)
  • D. Make-to-stock production (10)

Answer: D


NEW QUESTION # 42
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

  • A. The same batch management level is used.
  • B. The quantity and value updates are the same.
  • C. The same account category is used.
  • D. The same base unit of measure is used.

Answer: B,D


NEW QUESTION # 43
How do you model a production line in repetitive manufacturing?

  • A. As a routing
  • B. As a resource network
  • C. As a work center
  • D. As an operation

Answer: C


NEW QUESTION # 44
What is the difference between co-products and by-products?
Note: There are 2 correct answers to this question.

  • A. Only co-products have movement type 101.
  • B. Only co-products have movement type 531.
  • C. Only co-products have a non-zero inventory valuation.
  • D. Only co-products appear in the process or production order settlement rule.

Answer: A,C


NEW QUESTION # 45
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.

  • A. Material is only kept available in small quantities in production.
  • B. Material stock is built up for a long period of time in production.
  • C. Replenishment is always triggered on a regular basis.
  • D. Replenishment is only triggered when components are required.

Answer: A,D


NEW QUESTION # 46
What is the focus of repetitive manufacturing?

  • A. Period and quantity-oriented production
  • B. Detailed tracking of production orders
  • C. Production of lot size one
  • D. Low volume production

Answer: A


NEW QUESTION # 47
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.

  • A. Select a special explosion type inside the material BOM (bill of material)
  • B. Select a special explosion type inside the material master
  • C. Select a special procurement type inside the material BOM (bill of material)
  • D. Select a special procurement type inside the material master

Answer: C,D


NEW QUESTION # 48
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?

  • A. The operation is rescheduled backwards.
  • B. The operation CANNOT be dispatched.
  • C. The operation is rescheduled in the planning direction.
  • D. The operation is rescheduled to an alternative work center.

Answer: C


NEW QUESTION # 49
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.

  • A. MRP type
  • B. Procurement type
  • C. MRP group
  • D. Material type

Answer: A,B


NEW QUESTION # 50
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

  • A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
  • B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
  • C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
  • D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator

Answer: A


NEW QUESTION # 51
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.

  • A. You have the option to use forecast planning.
  • B. The delivery time is reduced.
  • C. You have the option to use make-to-order production.
  • D. Manufacturing time for final assembly is reduced.

Answer: A,C


NEW QUESTION # 52
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine the lowest explosion level at which a material occurs in all the product structures
  • B. To determine the priority of alternative components inside the material BOM (bill of material)
  • C. To determine the use of subitems inside the material BOM (bill of material)
  • D. To determine the sequence in which materials are planned in MRP

Answer: A,D


NEW QUESTION # 53
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.

  • A. Planned orders are created in MRP with reference to sales orders.
  • B. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
  • C. Production and procurement costs are managed on the sales order item level.
  • D. Storage location MRP areas are required to manage sales-order-specific stock.
  • E. Net requirements calculation is carried out for every sales order individually.

Answer: A,C,E


NEW QUESTION # 54
Which of the following is a scheduling method for a production order?

  • A. Determination of basic dates
  • B. Lead time scheduling
  • C. Key date scheduling
  • D. Determination of delivery date

Answer: B


NEW QUESTION # 55
How would you define a pegging structure for an order in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
  • B. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
  • C. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
  • D. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run

Answer: B


NEW QUESTION # 56
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?

  • A. Standard Sales and Operations Planning
  • B. Advanced Planning
  • C. Flexible Planning
  • D. Integrated Business Planning

Answer: D


NEW QUESTION # 57
Which order type is used for repetitive manufacturing?

  • A. Production order
  • B. Planned order
  • C. Process order
  • D. Kanban order

Answer: B


NEW QUESTION # 58
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. For which plant can the BOM be defined?
  • B. When does the BOM need to become effective?
  • C. In which storage location is the BOM required?
  • D. Which base unit of measure must the BOM have?

Answer: A,B


NEW QUESTION # 59
......