NEW QUESTION # 52
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Net requirements calculation is carried out for every sales order individually.
- B. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- C. Storage location MRP areas are required to manage sales-order-specific stock.
- D. Production and procurement costs are managed on the sales order item level.
- E. Planned orders are created in MRP with reference to sales orders.
Answer: A,D,E
NEW QUESTION # 53
How would you define a pegging structure for an order in the context of Advanced Planning?
- A. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
- B. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
- C. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
Answer: D
NEW QUESTION # 54
You want to use capacity availability checks for production orders. Which settings have to be made for this?
Note: There are 2 correct answers to this question.
- A. An overall profile must be assigned in the checking control.
- B. The scope of check must be defined in Customizing.
- C. The Relevant for Finite Scheduling indicator must be set.
- D. A checking rule must be assigned to the work centers.
Answer: A,C
NEW QUESTION # 55
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?
- A. Engineering change management
- B. Batch management
- C. Process order management
- D. Quality management
Answer: B
NEW QUESTION # 56
How do you assign resources in a master recipe with operations and phases?
- A. You assign resources to the sub-operations.
- B. You assign resources to the header of the master recipe.
- C. You assign resources to the operations.
- D. You assign resources to the phases.
Answer: C
NEW QUESTION # 57
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Planned orders (firmed)
- B. ATP quantities
- C. Production orders
- D. Planned orders (unfirmed)
Answer: A,C
NEW QUESTION # 58
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to one batch if the product quality changes during production.
- B. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
- D. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
Answer: B,D
NEW QUESTION # 59
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special procurement type inside the material BOM (bill of material)
- B. Select a special procurement type inside the material master
- C. Select a special explosion type inside the material BOM (bill of material)
- D. Select a special explosion type inside the material master
Answer: A,B
NEW QUESTION # 60
In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?
- A. MRP creates the capacity requirements at the earliest possible time.
- B. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.
- C. MRP creates the capacity requirements without considering existing load on the work centers.
- D. MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.
Answer: D
NEW QUESTION # 61
Which of the following is a scheduling method for a production order?
- A. Lead time scheduling
- B. Determination of basic dates
- C. Determination of delivery date
- D. Key date scheduling
Answer: A
NEW QUESTION # 62
What is the focus of repetitive manufacturing?
- A. Low volume production
- B. Production of lot size one
- C. Period and quantity-oriented production
- D. Detailed tracking of production orders
Answer: C
NEW QUESTION # 63
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing a delivery address
- B. Changing a storage bin
- C. Changing a dependent requirement
- D. Changing an operation time
Answer: C,D
NEW QUESTION # 64
What does Consumption-based Planning use to determine requirements in the future?
Note: There are 3 correct answers to this question.
- A. Historical values
- B. Forecasting
- C. Dependent requirements
- D. Statistical procedures
- E. Planning file entries
Answer: A,B,D
NEW QUESTION # 65
Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Run MRP with automatic selection of production version.
- B. Run MRP with quota arrangement.
- C. Assign planned orders manually in the planning table.
- D. Run PP/DS heuristics for repetitive manufacturing.
Answer: B,D
NEW QUESTION # 66
Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
- A. Plant
- B. Production version
- C. Material
- D. Work center
Answer: C,D
NEW QUESTION # 67
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production quantity must lie within the lot-size range of the production version.
- B. The production quantity must only lie within the lot-size range of the routing in the production version.
- C. The basic end date of the order must lie within the validity period of the production version.
- D. The basic start date of the order must lie within the validity period of the production version.
- E. The production version must NOT be deleted.
Answer: A,B,D
NEW QUESTION # 68
What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.
- A. Reduced delivery times
- B. Option to use maketoorder production
- C. Reduced times for final assembly
- D. Option to forecast planning for production resources
Answer: A,C
NEW QUESTION # 69
......